|  September 21, 2014  |  
Mostly Cloudy   56.0F  |  Forecast »

Anchorage Roads July 18, 2013

Road Project Traffic Delays 

Last Updated: July 18, 2013

1. Old Seward Hwy. btwn. 34th Ave. and Tudor Rd.

Drivers should expect intermittent lane closures on Old Seward Hwy. btwn. 34th Ave. and Tudor Rd. for road improvements. Please use caution in the area.

Expected Completion: August, 2013

Information: Construction Unlimited, 243-8667

2. 9th Ave. btwn. Cordova St. and Ingra St.

Beginning Friday, July 19th at 8:00 PM through Monday, July 22nd at 6:00 AM, drivers should expect mulitiple lane closures at the intersection of Ingra St. and 9th Ave. for paving operations. Please expect delays.

Drivers should expect intermittent lane restrictions on 9th Ave. between Cordova St. and Ingra St. for road improvements. Please use detour routes.

Expected Completion: End of Season

Information: Renegade Equipment, 346-2300

3. Debarr Rd. btwn. Muldoon Rd. and Turpin St.

Drivers should expect lane closures on Debarr Rd. between Muldoon Rd. and Turpin St. between 8:00 AM and 4:00 PM daily.

Expected Completion: July, 2013

Information: GMC Contracting, 771-7728

4. Summer Haze 5 (4th Ave. btwn. C St. and D St.)

On Saturday, July 20th from approx. 10:00 AM to midnight, drivers should expect a full road closure on 4th Ave. between C St. and D St. for the Avenue Bar's Summer Haze block party event. Please watch for pedestrians, use caution in the area and use appropriate detour routes.

Information: Huycke Entertainment, 764-2690

5. Seward Hwy btwn. Tudor Rd. and Dowling Rd.

Use of Campbell Creek at the Seward Hwy. overpass will be restricted through the construction season, due to hazardous work zone conditions. Please follow signs for in/out access points.

New traffic patterns on Brayton Dr. will continue through September.

Be alert to reduced speeds of 45 mph, construction signs and trucks entering and exiting the roadway.

Information: DOT, 770-2612 or visit http://www.alaskanavigator.org/projectDetails.php?id=6

6. Dowling Rd. btwn. C St. and Old Seward Hwy.

Drivers should expect intermittent flagging operations and lane closures on Dowling Rd. from the Old Seward Hwy. to C St., Monday through Saturday, between 7:00 AM and 5:00 PM.

The north side pedestrian pathway on Dowling Road between, C Street and Old Seward Highway, is CLOSED to the public through the winter. Pedestrians must use the pathway on the south side.

Expected Completion: End of season

Information: QAP, 770-0803; DOT, 929-7244 or visithttp://www.alaskanavigator.org/projectDetails.php?id=10

7. Eklutna River Bridge at Old Glenn Hwy.

The Eklutna River Bridge at Old Glenn Hwy. is closed to vehicular traffic until further notice. Please use alternate routes.

Expected Completion: TBA

8. Girdwood Wastewater Treatment Facility Upgrade

Drivers should expect additional traffic around Girdwood this spring and summer as Anchorage Water and Wastewater Utility resumes construction activity at its Girdwood Wastewater Treatment Facility on Ruane Road.

Truck traffic will increase midā€April with the hauling of gravel from Portage, via the Seward and Alyeska Highways, to the treatment facility. The trucks may slow traffic while entering and exiting Girdwood.

Expected Completion: End of season

Information: Agnew::Beck, 222-5424; AWWU, 564-2785

9. Anchorage Market & Festival

Drivers should expect lane closures on W. 3rd Ave. between C St. and E St. from 6:00 AM to 6:00 PM each Saturday and Sunday for the Anchorage Market & Festival. Please watch for pedestrians and use caution in the area.

Expected Completion: Sunday, September 8th

Information: Webb's Consulting & Management, 272-5634

10. Spenard Rd. at McRae Rd.

FUTURE CLOSURE Beginning on approx. Monday, Julu 29th, drivers should expect intermittent lane restrictions and flagging operations on Spenard Rd. at McRae Rd. for road improvements. Please use caution in the area.

Expected Completion: August, 2013

Information: Pruhs Construction, 441-7555

11. Eagle River Road, MP 5.3 to 12.6

Be alert to intermittent flagging, pilot car operations and lane restrictions, Monday through Sunday from 8:30 AM to 8:00 PM. During pilot car operations, please obey all signage and wait for pilot car traveling in your direction.

All pedestrian and bicycle traffic will be transported through the active work zone by pilot car.

Expected Completion: End of Season

Information: Pruhs Construction, 279-1020; DOT, 622-5111 or visit http://www.alaskanavigator.org/projectDetails.php?id=62

12. Victor Rd. btwn. 100th Ave. and Dimond Blvd.

FUTURE NORTHBOUND LANE CLOSURE: Beginning on Wednesday, July 24th at 8:00 PM, the northbound lanes of Victor Rd. from 100th Ave. to Dimond Blvd. will be closed through Thursday, July 25th at 6:00 AM. Traffic will be unable to cross over the northbound lanes. Please follow construction signs for detour routes.

FUTURE SOUTHBOUND LANE CLOSURE: Beginning Thursday, July 25th at 8:00 PM, the southbound lanes of Victor Rd. from 100th Ave. to Dimond Blvd. will be closed through Friday, July 26th at 6:00 AM. Traffic will be unable to cross over the southbound lanes. Residents living on the west side of Victor Rd., Canary Ct., and Sea Parrot Circle will have no vehicle access to Victor Rd. for approx. 4 hours during this time. Alternative parking arrangements can be made if you need to travel during this time.

Nightly paving operations will continue on Victor Rd., side streets (Canary Ct., Sea Parrot Circle, Minerva Way, Kingsford Ct., Olympic Dr.) and the 100th Ave./Victor Rd. intersection on Friday, July 26th and Friday, August 2nd, from 8:00 PM to 6:00 AM. Be alert to changing traffic patterns and flagging operations, and follow construction signs for detour routes.

Work will continue at the Victor Rd. and 100th Ave. intersection through the end of July. During this time, please be alert to new traffic patterns at the intersection.

Expected Completion: September, 2013

Information: Roger Hickel Construction, 279-1400; DOT, 770-5677 or visit http://www.alaskanavigator.org/projectDetails.php?id=74

13. Skinny Raven Her Tern Half Marathon (South Addition Area)

On Sunday, July 21st, drivers should expect multiple road closures in the South Addition area for the Skinny Raven Her Tern Half Marathon. The following roads will be impacted:

  • W. 9th Ave. and W. 10th Ave. between L St. and P St.
  • Lane restrictions on L St. between W. 8th Ave. and W. 10th Ave.
  • N St. between W. 10th Ave. and W. 15th Ave.
  • W. 15th Ave. between N St. and U St.

APD officers will assist with race crossings and residents will maintain access, though please expect some short delays. Please watch for runners in the area and use caution.

Information: Skinny Raven Sports, 274-7222

14. Glenn Hwy. Path Rehabilitation - Muldoon Rd. to North Birchwood

The pedestrian pathway will be closed due to paving operations, from North Eagle River Access Rd. (Artillery Rd.) to the North Birchwood overpass, from approx. 5:00 AM to 7:00 PM, through the first week of August. Please follow construction signs for detour routes.

Be alert to intermittent path closures and construction activity on the path between the Hiland Dr. exit and Muldoon Rd, from 8:00 PM to 6:00 AM.

Expected Completion: September, 2013

Information: Granite Construction, 344-2593; DOT, 622-4111 or visit http://www.alaskanavigator.org/projectDetails.php?id=60

15. Seward Hwy. MP 67 to 115

Expect daily lane restrictions and flagging operations from north of Lyon Creek Bridge to Potter Valley Rd. between 7:00 AM and 7:00 PM, through October.

Be alert to heavy equipment and construction workers on the shoulder.

Expected Completion: End of Season

Information: Granite Construction, 344-2593; DOT, 770-5677 or visit http://www.alaskanavigator.org/projectDetails.php?id=73

16. K St. btwn. W. 4th Ave. and W. 5th Ave.

Drivers should expect a full road closure on K St. between W. 4th Ave. and W. 5th Ave. for paving operations. Please use detour routes.

Expected Completion: Friday, July 12th

Information: McKenna Brothers Paving, 440-1512

17. Reka Dr. btwn. Bragaw St. and Pine St.

Drivers should expect intermittent lane restrictions and full road closures on Reka Dr. between Bragaw St. and Pine St. for utility work and road improvements. Limited access will be maintained for those side streets affected by closures.

FUTURE CLOSURE: Beginning Friday, August 9th at 8:00 PM through Tuesday, August 16th at 6:00 AM, drivers should expect a full road closure on Bragaw St. at Reka Dr. for utility work. Please use appropriate detour routes.

Expected Completion: September, 2013

Information: BC Excavating, 344-4490

18. Dimond Blvd. btwn. Jewel Lake Rd. and Seward Hwy.

Drivers should expect lane restrictions, flagging operations and construction-related noise from 8:00 PM to 6:00 AM.

Expect intermiitent approach and turn pocket closures due to fresh pavement.

Work has begun between C St. and the Seward Hwy.

Expected Completion: September, 2013

Information: http://www.alaskanavigator.org/projectDetails.php?id=78

19. Old Seward Hwy. at Communications Ave.

Beginning Friday, July 19th through Tuesday, July 23rd, drivers should expect intermittent southbound lane closures at the intersection of Old Seward Hwy. and Communications Ave. for utility work. Eastbound Communications Ave. will also have intermittent closures.

Information: ACS, 563-8000

20. Middlerock Rd. at Catine Cir.

Drivers should expect an intermittent full road closure on Middlerock Rd. at Catine Cir. Residents will maintain limited access. Please use detour routes to access residential homes.

Expected Completion: Monday, July 29th

Information: GCI, 868-8848

21. West End Block Party (W. 4th Ave. btwn. K St. and L St.)

FUTURE CLOSURE: On Thursday, July 25th, drivers should expect a full closure on W. 4th Ave. between K St. and L St. for the Snow City Cafe West End Block Party event. Please use detour routes.

Information: Snow City Cafe, 272-2489

22. Skinny Raven Her Tern Half Marathon Expotique (W. 8th Ave.)

Beginning Friday, July 19th at 8:00 PM through Saturday, July 20th at 10:00 PM, drivers should expect a full closure on W. 8th Ave. between H St. and I St. for the Skinny RavenHer Tern Half Marathon Expotique. Please use detour routes.

Information: Skinny Raven Sports, 274-7222

23. Salmon Daze Festival (G St. btwn. 3rd Ave. and 5th Ave.)

On Saturday, July 20th from 8:00 AM to 10:00 PM, drivers should expect a full closure on G St. between 3rd Ave. and 5th Ave. for the Anchorage Downtown Partnership's Salmon Daze Festival. Please use detour routes.

Information: Anchorage Downtown Partnership, 279-5650

24. Old Eagle River Rd. at Monte Rd.

Drivers should expect intermittent lane and road closures on Old Eagle River Rd. at Monte Rd. for road improvements. Please use detour routes.

Expected Completion: August, 2013

Information: Pruhs, 770-6820

25. 3rd Ave. btwn. H St. and K St.

Drivers should expect a full road closure on 3rd Ave. between H St. and K St. for retaining wall improvements. Drivers should also expect intermittent lane restrictions on I St. and K St. Please use detour routes and be aware of restricted areas.

Expected Completion: July, 2013

Information: Seacoast Construction, 345-5219

26. Baxter Rd. at 16th Ave.

On Monday, July 22nd, between 9:00 AM and 4:00 PM, drivers should expect a full closure at the intersection of Baxter Rd. and 16th Ave. for road repairs. Please use detour routes.

Information: Municipal Street Maintenance, 343-8182

27. Senate District K Road Rehabilitation (Tudor/Patterson Area)

Drivers should expect intermittent lane restrictions and road closures in the Senate District K area for road improvements. The following roads will be impacted:

Laron, Patricia and Deborah Lanes, James, Madelynne, Dorothy and Irene Drives, Anne Circle and Hennings Way.

Expected Completion: End of Season

Information: Pruhs Construction, 250-8394

28. Northwood Dr. btwn. Raspberry Rd. and Strawberry Rd.

Beginning Friday, July 12th, drivers should expect single lane restrictions on Northwood Dr. between Raspberry Rd. and Strawberry Rd. from 8:00 AM to 4:00 PM weekdays for road improvements.

Expected Completion: Friday, July 19th

Information: MOA Street Maintenance, 343-8182

29. Cope St. btwn. Tudor Rd. and W. 40th Ave.

Drivers should expect intermittent land restrictions and road closures on Cope St. between Tudor Rd. and W. 40th Ave. for utility work. Please use appropriate detour routes.

Expected Completion: Thursday, August 1st

Information: BC Excavating, 344-4490

30. Johns Rd. btwn. Highview Dr. and Klatt Rd.

Expect daily lane restrictions, flagging operations and construction-related noise Monday through Saturday.

Be alert to heavy equipment and construction workers on the shoulder.

Expected Completion: September, 2013

Information: DOT, 646-9640

31. Valley St. at E. 12th Ct.

Drivers should expect intermittent road closures in the area of Valley St. at E. 12th Ct. for road improvements and utility work. Please use detour routes when applicable.

Expected Completion: End of Season

Information: Pruhs Construction, 441-7555

32. Bragaw St. at Mountain View Dr.

FUTURE CLOSURE: Beginning Saturday, July 27th at 6:00 AM through Sunday, July 28th at 10:00 PM, drivers should expect a full closure on Bragaw St. north of Mountain View Dr. for utility work. Please use detour routes.

At other times, please expect intermittent lane closures and flagging operations at the intersection.

Expected Completion: July, 2013

Information: Southcentral Construction, 953-2190

33. Birch Rd. btwn. Huffman Rd. and Kalgrin Dr.

Drivers should expect intermittent road closures on Birch Rd. between Huffman Rd. and Kalgrin Dr. for utility work and road improvements. Please use signed detour routes for residential access.

Expected Completion: July, 2013

Information: G&S Management Services, 344-3658

34. E. 11th Ct. btwn. State St. and Friendly Ln.

Drivers should expect an intermittent full road closure on E. 11th Ct. between State St. and Friendly Ln. for utility work and paving operations. Residents will maintain access. Please use detour routes.

Expected Completion: August, 2013

Information: BC Excavating, 344-4490

35. Postmark Dr. and East Airpark Drainage Improvements

Expect intermittent lane restrictions and closures on W. 50th Ave. between South Aircraft Dr. and Old International Airport Rd.

Expect lane restrictions and closures on westbound International Airport Rd. and Old International Airport Rd.

Information: Annette's Trucking, 344-9355 or DOT, 243-4169

36. E. 74th Ave. at Basel St.

Drivers should expect an intermittent closure at the intersection of E. 74th Ave. and Basel St. for utilty improvements. Please use detour routes when applicable.

Expected Completion: July, 2013

Information: Annette's Trucking, 344-9322

37. King St. at 87th Ave.

Drivers should expect intermittent lane shifts at the intersection of King St. and 87th Ave. for utility work between 9:00 AM and 4:00 PM, weekdays.

Expected Completion: Wednesday, July 31st

Information: ACS, 563-8000

38. Eureka St. btwn. 34th Ave. and 36th Ave.

Drivers should expect an intermittent full road closure on Eureka St. between 34th Ave. and 36th Ave. for utility work. Please use detour routes.

Expected Completion: Wednesday, July 31st

Information: AWWU, 564-2700

39. W. 74th Ave. btwn. Jewel Lake Rd. and Blackberry St.

Drivers should expect a full road closure on W. 74th Ave. between Jewel Lake Rd. and Blackberry St. for utility work. Residents will maintain access. Please use detour routes.

Expected Completion: Wednesday, July 31st

Information: Sanders & Sanders, 223-1887

40. Collins Wy. btwn. W. 62nd Ave. and W. 64th Ave.

Drivers should expect a full road closure on Collins Wy. between W. 62nd Ave. and W. 64th Ave. for utility work. Residents will maintain access. Please use detour routes.

Expected Completion: Wednesday, July 24th

Information: Sanders & Sanders, 223-1887

41. Senate District M Road Rehabilitation (Turnagain/Wisconsin Area)

Drivers should expect intermittent lane restrictions and road closures in the Senate District M area for road improvements. The following roads will be impacted:

Wiley Post, Balchen, Wisconsin, 35th Ave., Turnagain Pkwy., Orland, Gillam, Will Rogers, and 42nd Ave.

Expected Completion: End of Season

Information: GMG, 349-7854

42. Senate District L Road Rehabilitation (Tudor/Shelikof Area)

Drivers should expect intermittent lane restrictions and road closures in the Senate District L area for road improvements. The following roads will be impacted:

Eau Claire, 43rd Ave., Grape Pl., Needle, Shelikof, Chirikof

Expected Completion: End of Season

Information: GMG, 349-7854

43. Senate District J Road Rehabilitation (Muldoon/20th Area)

Drivers should expect intermittent lane restrictions and road closures in the Senate District J area for road improvements. The following roads will be impacted:

20th Ave., Greendale, 17th Ave., Short, Rebel Ridge, Early View, and Hidden View.

Expected Completion: End of Season

Information: GMG, 349-7854

44. Cherry St. btwn. E. 36th Ave. and Northwind St.

Drivers should expect an intermittent full road closure on Cherry St. btwn. E. 36th Ave. and Northwind St. for road improvements. Please use detour routes. Residential access will be provided.

Expected Completion: July, 2013

Information: Roger Hickel Contracting, 441-0174

45. Blackberry St. btwn. W. 88th Ave. and Dimond Blvd.

Drivers should expect an intermiitent full road closure on Blackberry St. between W. 88th Ave. and Dimond Blvd. for utility work. Residents will maintain access. Please use detour routes.

Expected Completion: Monday, July 29th

Information: GMC Contracting, 561-4733

 

Add your comment:
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement